Logistics

Construction materials are heavy, long, fragile or dusty, often all four. We book the freight that fits the cargo and follow it from the mill gate to discharge, with every milestone visible in the client portal.

How the cargo moves

Container (FCL)

20 ft and 40 ft containers, including flat racks and open tops for long or oversized pieces.

Best for: tiles, sanitaryware, chemicals, paint, cable, fittings, glass.

Breakbulk

General cargo vessels loading at the mill's port, usually from 1,000 t upwards.

Best for: rebar, wire rod, beams, coils, heavy plate, pipe.

Bulk and bags

Bulk carriers for cement and clinker, jumbo bags and bagged cement in containers or breakbulk.

Best for: cement, clinker, gypsum, bitumen in drums or bulk.

Rail and road

Rail and truck legs from Turkey into Europe, the Caucasus and Central Asia, and on-carriage to inland sites.

Best for: urgent lots, inland projects, prefab units.

Delivery terms we use

Most of our prices are quoted FOB at the origin port. We can quote CFR or CIF to your port, and EXW or FCA for buyers who arrange their own freight.

FOB

Free on board

Price includes loading on the vessel at the origin port. Freight and insurance are the buyer's.

CFR

Cost and freight

We book and pay the ocean freight to your port. Risk passes at loading.

CIF

Cost, insurance and freight

As CFR, plus cargo insurance in your favour.

FCA

Free carrier

Goods handed to your carrier at an agreed point, usually a container terminal.

EXW

Ex works

Goods ready at the mill or warehouse of the producer. Everything after that is the buyer's.

DAP

Delivered at place

For project sites, quoted case by case with on-carriage and local partners.

Equipment we book

  • 20 ft dry, up to about 28 t payload, for heavy cargo like tiles and cement
  • 40 ft dry and high cube for volume cargo like insulation and fittings
  • Flat rack and open top for long pipe, beams and machinery
  • Breakbulk holds and hatch covers for bundled steel

Tracking every milestone

Clients see each order in the CINOVA portal: contract, production, loading, sailing, arrival and delivery, with the bill of lading, container numbers and documents attached.

Client login

Questions buyers ask

Do you act as a freight forwarder?

We arrange freight for the cargoes we sell. We book vessels and containers with carriers and work with licensed forwarders and customs brokers at each end.

How long is the transit time?

It depends on the lane. As a guide, Turkey to West Africa is about 2 to 4 weeks, China to East Africa 3 to 5 weeks and China to the US East Coast 5 to 7 weeks.

Can you consolidate several suppliers into one container?

Yes, when the suppliers are in the same region. We collect at one warehouse and load one container with one set of documents.

Who clears customs at destination?

Import clearance is normally arranged by the buyer or the buyer's broker. We provide the documents your customs require.

Need a freight plan with the price?

Tell us the destination port or site and we quote CFR, CIF or delivered.